Cape Coral · Sarasota to Naples · 24/7
Electrical Panel and Service Upgrades
Gulf Coast Electrical Solutions replaces electrical panels and upgrades electrical services, such as 100 to 200 amp upgrades, for homes and businesses from Sarasota to Naples, including load calculations, permits and utility coordination.

When to upgrade a panel or service
- You are adding an EV charger, generator, pool equipment, a larger AC or an addition
- The panel has no open spaces for new circuits
- Breakers trip often or the panel feels warm
- The panel or meter was damaged by water, salt air or a storm
- An insurance company or inspector flagged the panel
What the upgrade involves
- Load calculation to confirm the right size.
- Permit and scheduling with your utility, such as FPL or LCEC, for disconnect and reconnect.
- Installation of the new panel or service equipment, grounding and bonding.
- Surge protection. Replaced residential services generally need a surge protective device under current code.
- Inspection and power restored.
Commercial services and meter centers
For commercial and multi-unit buildings we work on larger services, meter banks and distribution panels.
Frequently asked questions
How long does a 200 amp service upgrade take?
The electrical work is often done in a day. The full timeline depends on permit and utility scheduling.
Do I need a permit for a panel upgrade?
Yes. Panel and service replacements require an electrical permit and inspection. We handle the permit.
Will the power be off during the upgrade?
Yes, for part of the day while the utility disconnects and reconnects the service. We tell you the plan in advance.
Need an electrician today?
Call 24/7 or send us the details. Most estimates are free.